Highlights Include:

  • 85.3 composite metres of 0.67% NiEq (57.3 GT) starting at 156 m vertical depth
  • 79.5 composite metres of 0.65% NiEq (51.5 GT) starting at 215 m vertical depth
  • 48.5 composite metres of 0.83% NiEq (40.4 GT) starting at 273 m vertical depth  
  • Mineralized zone is up to 80 m thick, continuous for 180 m down dip, and open in both dip directions (see Cross-Section of results in Figure 1)
  • Assay results from 9 drill holes pending

Toronto, Ontario – January 23, 2023 - Metal Energy Corp. (the "Company" or "Metal Energy") (TSXV: MERG, OTCQB: MEEEF) is pleased to announce assay results from three drill holes on the same section (Table 1, Figure 1) of the Phase Two drill program on the high-grade nickel and copper-cobalt Manibridge project (the "Project" or "Manibridge") in the Thompson Nickel Belt, Manitoba.  Phase Two's 10,000 metres drill program was completed in December 2022, with nine additional drill hole assay results still pending.

Table 1 - Drill hole composite assay results from Section 5N

 

DDH

Composite Width (m)

 

Ni%

 

Cu%

 

Co%

 

NiEq%

GT

(NiEq% xm)

MNB029

Upper Lens

Lower Lens

 

N/A

48.5

 

 

0.80

 

 

0.02

 

 

0.02

 

 

0.83

 

 

40.4

MNB030

Upper Lens

Lower Lens

 

4.50

79.50

 

1.03

0.62

 

0.06

0.01

 

0.01

0.01

 

1.07

0.65

 

4.8

51.5

MNB031

Upper Lens

Lower Lens

 

1.00

85.30

 

0.42

0.65

 

0.03

0.02

 

0.01

0.01

 

0.44

0.67

 

0.4

57.3

MNB004*

Upper Lens

Lower Lens

 

N/A

51.00

 

 

0.86

 

 

0.03

 

 

0.02

 

 

0.90

 

 

45.9

Notes to Table 1:
1. See Table 3 for individual results used to compile these composite results
2.* Inidividual assay results comprising the composite results were previously released, see Metal Energy news release dated August 3, 2022
3. 
^ Results not accurate as large sampling gaps exist within these intervals

Figure 1 – Cross-section of results for Section 5N (MNB004, MNB029 to MNB031)

"These are the best results we have drilled on Manibridge to date, with grade-thickness values ("GT") consistent with what was mined at Manibridge.  These three drill holes, 250 m away from the old mine workings, were drilled on the same section and down dip of MNB004, which returned 0.90% NiEq over 51.0 composite metres (45.9 GT). This section of drill holes shows consistent nickel mineralization between 60 to 80 metres thick, extending over 180 metres down dip, and remains open in both dip directions.  These four drill holes were in a relatively untested area, and these new data significantly improves our interpretation of the mineralization potential at Manibridge. Mineralization appears to be more concentrated and thicker as we get closer to the  old mine workings.  We are awaiting the results from the remaining nine drill holes which are from the next 3 sections," said James Sykes, CEO of Metal Energy.

Manibridge Phase 2 Drill Program Results

A total of 10,091 metres were completed over 36 diamond drill holes, including 6 abandoned drill holes, with all completed drill holes having intersected visible nickel sulphides. The drill hole collar locations were all within 150 to 600 metres of the old mine workings. The drill holes targeted the shallower parts of the Manibridge nickel sulphide system at depths between 100 and 400 metres from surface. A total of 10,091 metres were completed over 36 diamond drill holes, including 6 abandoned drill holes, with all completed drill holes having intersected visible nickel sulphides. The drill hole collar locations were all within 150 to 600 metres of the old mine workings. The drill holes targeted the shallower parts of the Manibridge nickel sulphide system at depths between 100 and 400 metres from surface.

Assay results for drill holes MNB032 to MNB040A are still pending and will be reported after the data has been received, reviewed, and approved.    

The Company is preparing a detailed video to put the results received to date into context.

Metal Energy is the operator and owns 85% of the Project with Mistango River Resources Inc. (CSE: MIS), an Ore Group company, owning the remaining 15%.

Table 3 provides the individual and composite assay results and Table 4 provides the collar details for drill holes MNB029 to MNB031. 

Geochemical Sampling Procedures

Drill core samples were shipped to the Saskatchewan Research Council Geoanalytical Laboratories (SRC) in Saskatoon, Saskatchewan, in secure containment for preparation, processing, and whole rock and multi-element analysis by ICP-MS2 using total 4-acid digestion (HF:NHO3:HCl:HClO4). Assay samples comprise 0.2 to 1.5 m continuous samples of cut-core samples over nickel-sulphide mineralized intervals determined with a handheld XRF.  Point samples comprise an isolated 0.1 to 0.5 m sample to characterize the rock types, alteration, structure, and potential for mineralization. The SRC is an ISO/IEC 17025/2005 and Standards Council of Canada certified analytical laboratory. Blanks, standard reference materials, and quartered core repeats were inserted into the sample stream at regular intervals by Metal Energy and the SRC in accordance with Metal Energy's quality assurance and quality control (QA/QC) procedures. Geochemical assay data are subject to verification procedures by qualified persons employed by Metal Energy prior to disclosure.

All reported depths and intervals are drill hole depths and intervals, unless otherwise noted, and do not represent true thicknesses, which have yet to be determined.

For the latest videos from Metal Energy, Ore Group, and all things Mining, subscribe to our YouTube Chanel: youtube.com/@theoregroup

About the Manibridge Project

Manibridge encompasses 4,368 hectares within the world-class Thompson Nickel Belt. The Project is 20 kilometers southwest of Wabowden, which has significant infrastructure and capacity that has supported previous exploration programs and mine development, including year-round highway access via Highway 6.  

Table 2 below shows some of the historic drill intersections on the Manibridge project.

Table 2 - Selected Historic and Recent Drill Intersections on Manibridge

Hole Number

Location

From (m)

To (m)

Interval (m)

%Ni

%Ni*m

6-60

Underground

33.83

75.59

41.76

1.80

75.02

W50-39

Mined

98.45

163.98

65.53

1.10

72.14

W50-27

Mined

185.93

210.01

24.08

2.93

70.61

W50-34

Mined

86.26

110.64

24.38

1.88

45.76

W50-31

Mined

244.75

261.52

16.77

2.67

44.84

W50-05

Mined

311.51

336.80

25.29

1.57

39.64

MN08-01

Surface

156.50

195.75

39.25

0.98

38.47

W50-28

Mined

203.30

211.99

8.69

4.15

36.07

W50-09

Mined

178.92

198.73

19.81

1.80

35.62

6-42A

Underground

270.51

287.43

16.92

1.98

33.44

W50-33

Mined

274.93

289.56

14.63

2.15

31.50

MNB004*

Surface

150.45

183.4

32.95

0.88

29.00

W50-50

Surface

184.40

196.60

12.20

1.24

15.13

Notes to Table 2:

  • Cut-off grade = 0.3% Ni
  • Maximum consecutive internal dilution = 3.0 m downhole
  • Historic drill holes have not been verified or confirmed with twinned drill holes
  • Metal Energy considers "high-grade" to be nickel mineralization with a concentration greater than 0.8% Ni.
  • All reported depths and intervals are drill hole depths and intervals, unless otherwise noted, and do not represent true thicknesses, which have yet to be determined.
  • "*" Drilled by Metal Energy in 2022  

Table 3 – Individual interval and total drill hole composite assay results

DDH

From

To

Interval

Ni%

Cu%

Co%

NiEq%

GT (Ni eq%*m)

MNB029

277.00

278.00

1.00

0.31

0.00

0.01

0.32

0.32

 

287.40

311.50

24.10

0.87

0.02

0.02

0.90

21.69

includes

291.50

292.50

1.00

1.10

0.04

0.02

1.14

1.14

and includes

296.50

304.50

8.00

1.23

0.03

0.02

1.27

10.16

and includes

307.50

310.50

3.00

1.02

0.02

0.02

1.06

3.18

 

317.00

334.00

17.00

0.79

0.02

0.02

0.82

13.94

includes

320.00

325.00

5.00

1.15

0.03

0.02

1.19

5.95

and includes

331.00

333.00

2.00

1.27

0.03

0.02

1.31

2.62

 

343.00

345.40

2.40

0.39

0.00

0.01

0.41

0.98

 

351.00

354.00

3.00

0.67

0.02

0.01

0.69

2.07

includes

353.00

353.50

0.50

1.06

0.03

0.02

1.09

0.55

 

361.00

362.00

1.00

1.36

0.03

0.02

1.40

1.40

Composite Summary

 

48.50

0.80

0.02

0.02

0.83

40.40

MNB030

182.50

187.00

4.50

1.03

0.06

0.01

1.07

4.82

includes

183.10

185.60

2.50

1.56

0.10

0.02

1.62

4.05

 

226.00

229.00

3.00

0.77

0.03

0.02

0.80

2.40

 

237.00

239.00

2.00

0.66

0.02

0.02

0.69

1.38

 

250.00

283.00

33.00

0.73

0.03

0.01

0.76

25.08

includes

255.00

257.00

2.00

1.26

0.06

0.02

1.30

2.60

and includes

261.00

268.00

7.00

1.10

0.05

0.02

1.14

7.98

and includes

281.00

282.00

1.00

1.15

0.03

0.03

1.21

1.21

 

289.50

299.00

9.50

0.36

0.00

0.01

0.38

3.61

 

304.00

309.00

5.00

0.30

0.00

0.01

0.30

1.50

 

312.00

339.00

27.00

0.63

0.00

0.01

0.65

17.55

includes

337.00

338.00

1.00

1.19

0.01

0.02

1.23

1.23

Composite Summary

 

84.00

0.65

0.02

0.01

0.67

56.34

MNB031

150.00

151.00

1.00

0.42

0.03

0.01

0.44

0.44

 

169.50

170.00

0.50

0.40

0.00

0.00

0.40

0.20

 

177.05

184.20

7.15

0.52

0.02

0.01

0.54

3.86

includes

177.05

177.50

0.45

1.46

0.01

0.01

1.48

0.67

 

191.00

196.65

5.65

1.01

0.00

0.01

1.03

5.82

includes

191.00

191.50

0.50

1.43

0.00

0.03

1.47

0.74

and includes

195.00

196.00

1.00

1.21

0.01

0.02

1.24

1.24

 

200.00

209.00

9.00

0.67

0.00

0.01

0.69

6.21

includes

201.00

203.00

2.00

1.23

0.01

0.02

1.26

2.52

 

215.50

250.00

34.50

0.66

0.02

0.01

0.68

23.46

includes

215.50

217.50

2.00

1.31

0.04

0.02

1.36

2.72

and includes

221.00

222.00

1.00

1.38

0.04

0.02

1.42

1.42

and includes

233.00

242.00

9.00

1.06

0.04

0.02

1.10

9.90

 

253.00

274.00

21.00

0.45

0.02

0.01

0.47

9.87

includes

255.00

256.00

1.00

1.07

0.14

0.02

1.14

1.14

 

277.00

285.00

8.00

0.98

0.03

0.02

1.01

8.08

includes

281.00

284.00

3.00

1.49

0.06

0.02

1.54

4.62

Composite Summary

 

86.80

0.65

0.02

0.01

0.67

57.94

 

Notes to Table 3: 
1. 
Ni% cutoff grade is 0.30%
2. Ni% cutoff grade for "includes/and includes" is 1.00% Ni
3. Reported widths do not contain greater than 2 m of consecutive core with less than cutoff grades
4. Ni eq.% is calculated as the sum of Ni% + Co% * (51,960/33,960) + Cu% (9,470/33,960)
5. Price of Ni = $33,960/metric ton, price of Co = $51,960/metric ton, price of Cu = $9,470/metric ton
6. Metal prices were derived from Shanghai Metal Market website (www.metal.com) on January 3, 2023

Table 4 – Drill hole collar details

DDH

Target Area

Section

East

North

Elevation

Azimuth

Dip

EOH

MNB029

Manibridge Mine

5 North

510,770

6,062,158

236

300

-80

377

MNB030

Manibridge Mine

3.  5 North 

510,770

6,062,158

236

300

-72

400

MNB031

Manibridge Mine

 5 North 

510,770

6,062,158

236

300

-62

300

3 DDH

 

 

 

1,077

Notes: East and North units are metres using NAD83 datum, UTM Zone 14N
Elevation is recorded as "metres above sea level"
EOH = End of hole, measured in metres

About Metal Energy Corp.

Metal Energy is a nickel and battery metal exploration company with two projects, Manibridge and Strange, in the politically stable jurisdictions of Manitoba and Ontario, Canada, respectively. The Manibridge project is 85% owned by Metal Energy and 15% owned by Mistango River Resources Inc. (CSE: MIS). The Strange project is subject to earn-in agreements where the Company can acquire 100% exploration rights to approximately 12,000 hectares.  

QP Statement

The technical information contained in this news release has been reviewed and approved by Mike Sweeny, P.Geo., Vice-President, Exploration & Development for Metal Energy, and a Qualified Person as defined in "National Instrument 43-101, Standards of Disclosure for Mineral Projects." 

For further information, please contact:

Metal Energy Corp.

MERG on the TSXV

James Sykes, CEO

jsykes@oregroup.ca

306-221-8717

www.metalenergy.ca

Reader Advisory

Certain information set forth in this news release contains forward-looking statements or information ("forward-looking ‎statements"), including details about the business of the Company. By their nature, forward-looking statements are subject to numerous risks ‎and uncertainties, some of which are beyond the Company's control, including the impact of general economic conditions, ‎industry conditions, volatility of commodity prices, currency fluctuations, environmental risks, operational risks, competition from ‎other industry participants, stock market volatility. Although the ‎Company believes that the expectations in its forward-looking statements are reasonable, its forward-looking statements have ‎been based on factors and assumptions concerning future events which may prove to be inaccurate. Those factors and ‎assumptions are based upon currently available information. Such statements are subject to known and unknown risks, ‎uncertainties and other factors that could influence actual results or events and cause actual results or events to differ materially ‎from those stated, anticipated or implied in the forward-looking statements. Accordingly, readers are cautioned not to place undue ‎reliance on the forward-looking statements, as no assurance can be provided as to future results, levels of activity or achievements. ‎Risks, uncertainties, material assumptions and other factors that could affect actual results are discussed in our public disclosure ‎documents available at www.sedar.com including the Filing Statement dated November 15, 2021. Furthermore, the forward-looking statements contained in this document are made as of ‎the date of this document and, except as required by applicable law, the Company does not undertake any obligation to publicly ‎update or to revise any of the included forward-looking statements, whether as a result of new information, future events or ‎otherwise. The forward-looking statements contained in this document are expressly qualified by this cautionary statement.‎

Neither the TSX Venture Exchange Inc. nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release